Everything a yard or naval architect needs to put ENVSonic on the build sheet: the drawings we mark up, the schedules we supply, and the certificates class and insurers ask for. Send the GA and the pack comes back marked up for the vessel.
The pack
| Document | What it is for | Status |
|---|---|---|
| Transducer plan checklist | Positions, counts and coverage per structure, worked from the GA | Available on request |
| Cable schedule template | Runs, lengths, glands and penetrations for the yard’s electrical package | Available on request |
| Integration drawing samples | Cabinet, DIN-rail and control-module integration examples | Available on request |
| GA markup example | A marked-up general arrangement showing a typical multi-structure install | Available on request |
| ENVS1 datasheet | Control module specifications: channels, supply, enclosure, modes | Available on request |
| ENVS2 datasheet | Cabinet specifications, remote monitoring and SCADA interfaces | Available on request |
| Transducer and footprint datasheet | T50 and T60 transducers, IP68 rating, footprint mounting | Available on request |
| FCC, CE and RCM certificates | Full-system certification for class, flag and insurers | Available on request |
| Installation guide | Surface preparation, bonding, cabling, commissioning | Available on request |
| Commissioning checklist | Channel-by-channel verification and handover | Available on request |
How spec-in works
- Send the GA and the list of systems to protect.
- We mark up transducer positions and cable routes and return the transducer plan and cable schedule, typically within two working days.
- The yard integrates the control hardware into its electrical package using the drawings and schedule.
- We commission channel by channel and hand over with the monitoring live.
Installation video for the T50 and T60 transducers: watch it here.