Every ENVSonic system is specified, commissioned and supported by the engineering team that designs and builds it at GLOBAtech Australia, working with regional partners who install and support locally. These are the services around the hardware.
Engineering and transducer plans
Send the vessel’s general arrangement and, for cooling systems, the cooler and pipework drawings. We return a transducer plan, a cable schedule and a proposal: how many channels, where each transducer goes, and which control hardware suits the vessel or plant. Yards and naval architects get integration drawings at the drawing stage.
Configure a system → Spec-in pack for yards and naval architects →
Installation and commissioning
Transducers bond to the inboard side of the hull or the dry side of the equipment, inside the vessel, so most systems are fitted in service and without docking. Installation is carried out by a regional partner, the yard or the OEM team; operators who fit a system themselves follow the written guide and the installation video.
At commissioning every channel is tested and calibrated, and the installation is registered with its serial number. The warranty and the vessel record start from that date.
Installation guidance → Regional partners →
Monitoring & Maintenance plan
The plan keeps a system connected to the ENVSonic dashboard and under the eye of the engineering team for its working life, so a problem is found from the data before it costs protection.
- On board: every channel tests and calibrates itself daily.
- Dashboard: the results are recorded for the crew, the office and the engineering team.
- Engineering team: reviews the data and flags a weakening bond, a drifting channel or a supply problem.
- Action: advice, a firmware update, a part or a visit, planned around the vessel's programme.
- Five-year warranty: join within six months of commissioning and the complete-system warranty extends from three years to five, for as long as the plan stays active.
- Health reviews: a scheduled review of every channel’s daily self-test record.
- Firmware updates: applied as they are released.
- Planned service: advice, parts and visits arranged around the vessel’s or plant’s programme.
What a plan includes for a particular vessel, fleet or plant is set out in its proposal.
Fleet pilots
For fleets we recommend a single-vessel pilot with agreed measurements and success criteria. Fleet terms are settled in the pilot agreement up front, so a successful pilot moves straight to standard fitment across the class. The pilot programme →
Documentation for class, yards and insurers
FCC, CE and RCM certificates for the complete system, installation and operation manuals, integration drawings and the spec-in pack are supplied with each proposal and on request. Spec-in pack →
Support
Remote diagnosis through the dashboard where fitted, replacement parts shipped with fitting instructions, and a regional installer on site when it is needed. Existing customers can reach the engineering team through the dashboard or the contact form.