In service··1 min read

S/Y Encore: thirteen years in service, clean through at survey

Fitted at build in 2013, the Alloy Yachts AY45 came through full refit and survey with no scaling, no biological growth and no corrosion build-up in her seawater systems.

Transducer on rudder

When S/Y Encore went in for full refit and survey this year, the inspectors opened pipework that had not been dosed or dismantled since the vessel was built. They found no scaling, no biological growth and no corrosion build-up.

Thirteen years in service. Clean through. No scaling, no biological growth, no corrosion build-up. I’d recommend it to any serious offshore operator without hesitation.

Jono Wishart — Skipper, S/Y Encore

The installation

Encore was fitted at build with an ENVS1 four-channel system on dual AC/DC supply, protecting propellers, shafts, rudders, stabilisers and the raw-water pipework. Transducers were bonded via the proprietary footprint; nothing sits in the water flow and nothing enters the water column.

Why it matters

For superyachts the case is reliability and the anchorage: silent, invisible protection with no chemicals. For commercial operators the same result reads as cooling capacity held at design, no diver cleans and no dosing cycle across a docking interval.

Read the case study →

Filed under
Related

More news

All news →

Talk to the engineers who built it

As the OEM we design the transducers, footprint, electronics and firmware, build them in Australia, and support every system end to end, backed by a three-year complete-system warranty, or five years with a Monitoring & Maintenance plan.