Two near-new Ro-Pax ferries on a short Australian island route were fouling faster than conventional antifouling could hold back about a year into service. A retrofit across both vessels, hull protection plus raw-water cooling, was scheduled around the timetable and commissioned in operational sequence. Fouling on the protected zones has been under continuous in-service control since.
The problem
When the operator brought two new Ro-Pax ferries into service on a short island route, ENVSonic was not in the original specification. About a year into service the picture changed: both vessels were developing biofouling at a rate conventional antifouling was not holding back. Short inter-island routes mean low average speeds and frequent port stays with repeated warm-water exposure at the dock, and a tight timetable means an unscheduled hull clean is not a cost line but a service disruption. In cool-temperate southern waters summer favours rapid accumulation and winter only shifts the dominant species.
What changed
A comprehensive retrofit across both vessels: hull protection plus raw-water cooling-system protection. Transducers bond to the structure via the proprietary footprint with no drilling, no welding and nothing in the water flow, so the install was scheduled around the ferries’ service pattern and commissioned by the engineering team in operational sequence, with no extended lay-up.
The result
In the months since, fouling growth on the protected hull and cooling zones has been under continuous, in-service control. The work is a useful counter-example to the assumption that ultrasonic antifouling is a build-spec decision: a vessel already in service, even one with an active fouling problem, can be fitted and validated without taking it off the route.
Run it on your route
The deployment sits within a wider Australian Ro-Pax and ferry installed base alongside other Australian ferry operators, Port of Brisbane workboat protection and Australian box-cooler and keel-cooler installations, in a home market with one of the most stringent biosecurity regimes in the world. Hull protection → · Start with a measured pilot →
Named fleet references are available to prospective customers on request.

