ENVSonic

Pilot programme

One vessel, agreed measurements, twelve months. The results are published whatever they show, and a successful pilot moves straight to standard fitment across the class.

The operator is named in the published results only where it agrees. This is how an Asia-Pacific towage operator went from two tugs to more than 25: read the precedent →.

How it runs

  1. Scope. From the GA and the operating profile we produce a transducer plan covering the systems to protect: sea chests, box coolers, strainers and pipework, hull plating, running gear.
  2. Baseline. A baseline period on the pilot vessel, or a sister vessel left unprotected on the same trade, so the comparison is against the same hull form and profile.
  3. Install. Transducers bond via the proprietary footprint with no drilling, no welding and no docking where the systems allow. Commissioning by the ENVSonic engineering team.
  4. Measure. Fuel per nautical mile in normalised speed bands, propeller slip as the independent fouling indicator, cooler delta-T where coolers are protected, and inspection photos at intervals.
  5. Review and decide. At twelve months the operator and ENVSonic review the data together, publish it, and agree fleet terms if the case is made.

What we measure

MetricMethodFrequency
Fuel per nautical mileNormalised speed bands from the vessel’s own logs, ISO 19030-aligned, compared against the baseline or sister vesselContinuous; reviewed monthly
Propeller slipTheoretical versus actual advance from the same logs; rising slip indicates fouling independent of weatherContinuous; reviewed monthly
Cooler delta-TSeawater inlet and outlet temperatures on protected and unprotected coolersDaily where coolers are in scope
Inspection photosSea chest, box cooler, strainer and running gear at agreed intervals, same positions each timeAt intervals agreed in the scope

What the operator commits to

  • Access to the operating data the measurements need: speed, fuel, position, cooler temperatures.
  • A baseline period or a sister vessel on the same trade for comparison.
  • Inspection access at the agreed intervals, including at the next docking.
  • Commercial terms agreed in writing before installation, alongside the measurements and the success criteria.

What ENVSonic commits to

  • OEM engineering: transducer plan, cable schedule and commissioning by the team that designs and builds the system.
  • Per-channel monitoring for the life of the pilot, with calibration and health data available to the chief engineer.
  • Published results whatever they show, with the operator named if it agrees.
  • Fleet terms for the rest of the class agreed in the pilot agreement up front, so a successful pilot moves straight to standard fitment.

Who it suits

  • Fleets with sister vessels on the same trade, where a clean comparison is available.
  • Operators facing CII, EU ETS or biofouling biosecurity pressure who need a measured answer rather than a brochure claim.
  • Yards and naval architects specifying a class, who want one proven configuration repeated across the build sheet.

To start, send the GA and a note on where the vessel operates. The enquiry form has a Pilot programme option that pre-selects when you arrive from this page. Apply for a pilot →

Talk to the engineers who built it

As the OEM we design the transducers, footprint, electronics and firmware, build them in Australia, and support every system end to end, backed by a three-year complete-system warranty, or five years with a Monitoring & Maintenance plan.