The operator is named in the published results only where it agrees. This is how an Asia-Pacific towage operator went from two tugs to more than 25: read the precedent →.
How it runs
- Scope. From the GA and the operating profile we produce a transducer plan covering the systems to protect: sea chests, box coolers, strainers and pipework, hull plating, running gear.
- Baseline. A baseline period on the pilot vessel, or a sister vessel left unprotected on the same trade, so the comparison is against the same hull form and profile.
- Install. Transducers bond via the proprietary footprint with no drilling, no welding and no docking where the systems allow. Commissioning by the ENVSonic engineering team.
- Measure. Fuel per nautical mile in normalised speed bands, propeller slip as the independent fouling indicator, cooler delta-T where coolers are protected, and inspection photos at intervals.
- Review and decide. At twelve months the operator and ENVSonic review the data together, publish it, and agree fleet terms if the case is made.
What we measure
| Metric | Method | Frequency |
|---|---|---|
| Fuel per nautical mile | Normalised speed bands from the vessel’s own logs, ISO 19030-aligned, compared against the baseline or sister vessel | Continuous; reviewed monthly |
| Propeller slip | Theoretical versus actual advance from the same logs; rising slip indicates fouling independent of weather | Continuous; reviewed monthly |
| Cooler delta-T | Seawater inlet and outlet temperatures on protected and unprotected coolers | Daily where coolers are in scope |
| Inspection photos | Sea chest, box cooler, strainer and running gear at agreed intervals, same positions each time | At intervals agreed in the scope |
What the operator commits to
- Access to the operating data the measurements need: speed, fuel, position, cooler temperatures.
- A baseline period or a sister vessel on the same trade for comparison.
- Inspection access at the agreed intervals, including at the next docking.
- Commercial terms agreed in writing before installation, alongside the measurements and the success criteria.
What ENVSonic commits to
- OEM engineering: transducer plan, cable schedule and commissioning by the team that designs and builds the system.
- Per-channel monitoring for the life of the pilot, with calibration and health data available to the chief engineer.
- Published results whatever they show, with the operator named if it agrees.
- Fleet terms for the rest of the class agreed in the pilot agreement up front, so a successful pilot moves straight to standard fitment.
Who it suits
- Fleets with sister vessels on the same trade, where a clean comparison is available.
- Operators facing CII, EU ETS or biofouling biosecurity pressure who need a measured answer rather than a brochure claim.
- Yards and naval architects specifying a class, who want one proven configuration repeated across the build sheet.
To start, send the GA and a note on where the vessel operates. The enquiry form has a Pilot programme option that pre-selects when you arrive from this page. Apply for a pilot →
